Ardfert Wastewater Treatment Plant

The contract included the following works:

Design and Build of the following: 

  • A 1200pe Wastewater Treatment Plant (including provision for future expansion up to an ultimate capacity of 2400pe) and access road at Ardfert, Co. Kerry
  • Gravity sewer from the existing foul collection system at Manhole No. F05a to the WWTP.
  • Pumped outfall pipe carrying effluent from the new Wastewater Treatment Plant to the Tyshe River (including provision for future expansion).
  • Pumped overflow of storm water from the Wastewater Treatment Plant to the River Tyshe.
  • 600mm diameter storm sewer between Glandore Gate and Station Road.
  • All works both temporary and permanent required to complete the Works (hereinafter called Design-Build).
  • Accommodation Work
  • Provision of an Operation Service Period for the new Wastewater Treatment Plant.

Client

Irish Water

Date

February 2017 – May 2018

Location

Ardfert, Co.Kerry