Ardfert Wastewater Treatment

Ardfert Water Treatment Plant

The?contract included?the following?works:

  • Design and Build of the following: –?
  • A 1200pe Wastewater Treatment Plant (including provision for future expansion up to an ultimate capacity of 2400pe) and access road at Ardfert, Co. Kerry?
  • Gravity sewer from the existing foul collection system at Manhole No. F05a to the WWTP.?
  • Pumped outfall pipe carrying effluent from the new Wastewater Treatment Plant to the?Tyshe?River (including provision for future expansion).?
  • Pumped overflow of storm water from the Wastewater Treatment Plant to the River?Tyshe.?
  • 600mm diameter storm sewer between?Glandore?Gate and Station Road.?
  • All works both temporary and permanent required to complete the Works (hereinafter called ?Design-Build?).?
  • Accommodation Work
  • Provision of an Operation Service Period for the new Wastewater Treatment Plant??

?

?

Client

Irish Water

Date

February 2017 – May 2018