Off-site construction was at the forefront of the design with the JV, utilising modular and containerised units to deliver within a tight site footprint. The method involved all modules, containers, pipe-racks and skids being manufactured off-site, with all equipment, instruments, valve and pipework suppliers delivering to our supply chain partner’s DfMA facility, where they were assembled. The modules were then delivered to the site, placed and installed in a “plug and play” fashion.